Structural & Seismic Design
Improving a building's ability to withstand seismic events or extreme weather through novel structural approaches.
More than half of all domestic investment goes into building homes, buildings, civil works, and utilities, yet most construction, architecture, and engineering firms have never claimed the credit their everyday design and problem-solving work already qualifies for.
See What Your Projects Qualify ForFirms that take on riskier or more complex projects tend to have more qualifying activity in concept design, schematic design, design development, and value engineering, and higher credits as a result.
Improving a building's ability to withstand seismic events or extreme weather through novel structural approaches.
Testing new concepts in sustainable design and technical improvements to a building's heat, light, and power efficiency.
Building Information Modeling, computational design, and digital fabrication used to resolve real design uncertainty.
In-depth evaluation of alternative construction methods, materials, and processes, tested against project-specific requirements.
A construction firm structured as a partnership may employ hundreds of people, yet only a small share of them touch qualifying work. In a typical case, the qualifying work sits with the people who solve design and construction problems on live projects, such as estimators, project managers, and superintendents, along with the outside engineers the firm hires.
Because a partnership passes the credit through to its partners, it can offset their individual income taxes. If the firm also operates in a state with its own R&D credit, that credit can come on top of the federal one.
A general illustration, not a Hito client result. Actual credits depend on each firm’s facts.
Figures reported by clients in other industries. They are not specific to construction.
Many firms mistakenly believe only civil or mechanical engineers designing revolutionary infrastructure qualify. In practice, estimators, project managers, superintendents, and project executives all routinely contribute qualifying work by developing shop drawings, evaluating alternative means and methods to construct a job, and testing constructed systems to confirm requirements are met.
Firms in the Mechanical, Electrical, and Plumbing (MEP) trades qualify too, even when their focus is narrow, because designing custom systems for a specific structure carries real technical uncertainty of its own.
Per the IRS's four-part test (opens in a new tab), work driven purely by aesthetic, style, taste, or seasonal design factors doesn't qualify. A building's material palette chosen for how it looks, not how it performs, is design work, not research. Research conducted after commercial production has already begun is excluded as well. The qualifying activity has to resolve genuine technical uncertainty, not aesthetic preference.
Talk with a specialist about what your team is already tracking on a recent job.
Book a Call →